Campus Planning and Design Committee, April 13, 2022, 2022
Scope and Contents
Campus Planning and Design Committee, April 13, 2022
- The minutes of 17 March 2022 were approved
- Quadrangle renovation: 2a) update on plans to renovate the basement of the quadrangle; 2b) committee response
- University athletics: 3a) Baseball clubhouse - Option A: a one-story structure with consolidated storage - Option B: a two-level complex with expanded storage in a separate building; 3b) Committee response; 4a) Warner Palaestra parking; 4b) Committee responces - Landscape: Security: Lighting: Accessibility; 5a) Football stadium sign; 5b) Committee response
- Saint Michael Hall parking: 6a) discuss a proposal to expand parking near the prep dorm; 6b) Committee response;
- Xcel Energy: 7a) Powerline; 7b) Committee response
- Saint John's Preparatory School: 8) Flagpole island
- Wimmer Hall: 9) Office space is to be created on the first floor of Wimmer Hall for the university dining/events staff
- Church stairwell: 10) committee inspected the new glass panels recently installed into the sides of the north-east stairway of the abbey and university church
- Church steps: 11) committee inspected the new (code-compliant) adhesive recently installed on the edge of the steps of the church balcony
- Parking Lot Expansion Proposal
1. Expand the current parking lot to 173 feet (additional 100 feet) along the existing stretch of grass that was shrubs and bushes before the completion of the Reno in June 2020.
2. Add a roughly 15-foot by 15-foot concrete slab for the 6-yard dumpster and 4-yard recycling container.
3. Repair the concrete pillar outside door #4 on Saint Michael Hall
Dates
- 2022
Extent
1 Folder
Language of Materials
From the Collection: English
Physical Location
061/5 (Box 1:04)
Immediate Source of Acquisition
2022-003, Robin Pierzina, OSB, Transfer
Physical Facet
Minutes
Repository Details
Part of the Saint John's University Archives and Special Collections Repository